company history

Himal Dolakha Hydrpower has a long and storied history in the world of Energy. We have been pioneers in the industry for many years and are known for taking innovative steps. We are very proud of our achievements and all the people who led us here.

Himal Dolakha Hydropower Company is established to develop hydropower managed by the team of diversified well experienced professionals, local and successful businessmen from various disciplines such as Management, Economics, Engineering, Education, Law, Human Resources and Public Affairs; committed to bring excellence in the corporate and public governance.

The company’s core business is Hydropower development managing comprehensive management of study to carry out feasibility study to determine the technical feasibility and financial viability of the Hydropower Project, which will be interconnected with the Integrated Nepal Power System (INPS). The study report can be used as a basis for concluding Power Purchase Agreement (PPA) with Nepal Electricity Authority (NEA), for obtaining the generation license from DOED and for funding arrangement of the project. The main tasks carried out during the field investigations are topographical survey and mapping of project area, surface geological mapping and hydrological survey. The main outcome of the study incorporates the general arrangement of project structures including feasibility level design and drawings and power and energy computation from the project. Moreover, the present study presents project cost estimate, construction schedule and financial analysis to ascertain the financial viability of the project.

Looking for a First-Class Energy Plan Consultant?